Jake took 8/14 & 15 off to work on the stalls.  He got the water line and electric trenched and ran out to the new barn and all of the walls up, lime in and leveled (I did most of that..:D) and now all we need is to put up some hog panels, doors and lights and we'll be done. Abby was quite the helper, but Adam preferred to watch or sleep!  

The next 3-4 weeks are super busy, though, so we probably won't be doing much more until mid-late September.  

~Kristine

8-16stalls01.JPG (87086 bytes) 8-16stalls02.JPG (102612 bytes) 8-16stalls03.JPG (73667 bytes) 8-16stalls04.JPG (69273 bytes) 8-16stalls05.JPG (82298 bytes) 8-16stalls06.JPG (69490 bytes) 8-16stalls07.JPG (92975 bytes) 8-16stalls08.JPG (87860 bytes) 8-16stalls09.JPG (68816 bytes) 8-16stalls10.JPG (96941 bytes) 8-16stalls11.JPG (82678 bytes) 8-16stalls12.JPG (74827 bytes)